A particularly interesting layout - three routes converge and terminate at Brighton,
the main line from London, used also by Thameslink services from Bedford, the
West coast line from Portsmouth and the East coast line from Eastbourne. Like
most of the "Southern", passenger services are intensive, with 30
trains an hour using the 8 platforms.
Working from the authentic signalling diagrams of the real installation, the
simulation accurately recreates the Brighton panel of Three Bridges Power Box, which controls the area. As well as Brighton itself, the stations at Hove, Preston
Park and London Road are included, as well as the Cliftonville Spur and access
to two yards and the large Lovers Walk maintenance depot.