PC-Rail Simulations

 

Login 


Available Simulations

Brighton


A particularly interesting layout - three routes converge and terminate at Brighton, the main line from London, used also by Thameslink services from Bedford, the West coast line from Portsmouth and the East coast line from Eastbourne. Like most of the "Southern", passenger services are intensive, with 30 trains an hour using the 8 platforms.

Working from the authentic signalling diagrams of the real installation, the simulation accurately recreates the Brighton panel of Three Bridges Power Box, which controls the area. As well as Brighton itself, the stations at Hove, Preston Park and London Road are included, as well as the Cliftonville Spur and access to two yards and the large Lovers Walk maintenance depot.

You will have your hands full with this one!

Brighton is one of our Classic Series simulations.

This simulation runs using our PC-Rail Plus software.


Download Brighton

Free

Register for Unlimited Use

£32.75


Level: Moderate

Standard timetable: 1995 SX, 127 trains (5.0 hours)

Current Version: 5.21 (07/06/23)

Extra timetable: 2004 SX, 624 trains (24.0 hours)